Check the address, vehicle and footprint
Record the street, entrance, floor, lift, carry distance, date, vehicle position, occupied area and external-lift footprint. In Genk, a move or lift using public space needs the current city occupation process.
Apply early and check city signage
Genk's current FAQ gives a ten-working-day planning point for moving, delivery and small-work occupation. Where parking-prohibition signs are needed, the city services place them. Recheck the live city source: conditions can change and a quote cannot grant permission or reserve public space.
Use Genk rules only for a Genk address
Bilzen-Hoeselt, Bocholt, Bree, Dilsen-Stokkem, Hamont-Achel, Lanaken, Lommel, Maaseik, Maasmechelen, Oudsbergen and Pelt are other current municipalities or authorities. Their legacy paths are not branches of this guide and remain retired. Lommel has its own current occupation process and is assessed separately.
Prepare the international move brief
Provide collection and delivery addresses, access notes, dates, vehicle position, equipment footprint and any city response. House Moving Company does not claim a local office, crew, fleet, permit handling, permission outcome, vehicle suitability or availability.
Official Genk information
Sources checked 15 November 2026. Recheck current city requirements before moving.