Start with the vehicle the company proposes
Colmar’s current moving form uses the following categories. They are municipal application categories, not specifications or capacity promises for a vehicle supplied by us.
| Vehicle category | Parking bays |
|---|---|
| 20 m³ van with tail lift | 3 |
| Rigid lorry | 4 |
| Articulated lorry | 5 |
Use your inventory to discuss the load, then ask the company to confirm the vehicle dimensions and how it would operate. A volume estimate cannot establish its physical length, weight limits, turning room or working clearances.
Describe lifting equipment separately
The same form lists a furniture lift separately, with pavement or carriageway positions to declare. Do not assume that the bays associated with a vehicle settle the space needed for another piece of equipment.
If a lift or different handling method is being considered, give the company the large-item dimensions, floor, entrance and any relevant building restrictions. Ask what assessment is needed and whether that service is actually available for the move. Those measurements are practical preparation advice; they are not an additional list of council form requirements.
The quotation should explain the agreed handling method and what remains subject to access or equipment assessment. This guide does not confirm that a lift can be used at your property.
Check the loading position at each address
The form’s address sections show checkboxes for one to four bays, although its articulated-vehicle category says five. If that applies to your proposal, explain the full requirement in the remarks and confirm how to complete it with the authority; do not silently reduce the count.
For the property in Colmar, show the proposed stop and the route for carrying the goods. For the other address, make a separate access assessment: a practical arrangement at collection does not prove the same vehicle or handling method will work at delivery.
For example, a tail lift may change how the crew works at one end while stairs or an entrance change the task at the other. Give the company both descriptions so it can quote on the actual operation rather than on a single bay number.
Assign the notice, sign and photo tasks
The 2026 form requires a complete request at least ten working days ahead, excluding public holidays. For marked-bay neutralisation, signs must be in place at least 48 hours ahead and photos sent to municipal police. It allows own or municipal sign installation.
Agree who requests the space, arranges the chosen sign option and sends the evidence. Keep the issued conditions with the actual vehicle proposal. Neither applying nor placing signs guarantees that every part of a proposed operation has been authorised.
Use the city’s current forms page to find the applicable moving document. Confirm charges directly rather than relying on an old saved tariff or treating municipal charges as automatically included in the removal price.
Send a load-and-access brief for your route
Choose UK to Colmar, Colmar to the UK, or Colmar ↔ EU above. The EU option asks the direction before placing Colmar on the collection or delivery side. Add the other address, goods, dates and any equipment or space questions still being assessed.
Ask the quotation to identify packing, dismantling, carrying and local tasks that are included. For a France–Great Britain journey, use the separate customs-documents guide. An EU route needs both actual countries identified; Great Britain paperwork should not be assumed to apply.
Your enquiry starts a discussion about the move. It does not reserve five bays, confirm lifting equipment or book a vehicle.